SULPHUR RECOVERY UNIT

Packages for Sulphur Recovery Unit

Heat Recovery in Sulphur Recovery Unit

Sulfur recovery unit is basically conversion of hydrogen sulfide (H2S) to elemental sulfur using Claus process with Condensers, reactors & Incinerator process. These processes involve burning H2S with air in a reactor furnace to form sulfur dioxide thereby generating Hot Gases.

The hot gas from the combustion chamber is quenched in a waste heat boiler that generates high to medium pressure steam.

TSPL is pioneers in supply of Clause pkg | Inc pkg | Waste Heat Boilers | Sulphur Condensers | Reactors

93

CAPACITY (TPH)

545

TEMPERATURE (°C)

115

PRESSURE (kg/cm2)

27

INSTALLATIONS

Thermal Systems provide MCC & Incinerator WHB packages for SRU in refinery

  • Fired Tube / Water Tube construction of WHB

  • Modular construction for ease of site assembly

  • Reaction Furnace (MCC) package for SRU

  • Incinerator Package for SRU

India's leading manufacturer having highest number of successful installations for SRU application in major refineries

REACTION FURNACE (MCC) PACKAGE

For Sulphur Recovery Unit

In the production of Low Ash Metallurgical Coke (LAMC), large quantities of heat is carried away by flue gases and the hot coke itself. We have successfully operating WH Boilers, Custom Built to suit the plant layouts & location of gas tapping.

We have used: HORIZONTAL-MODULAR single pass, VERTICAL - HORIZONTAL, VERTICAL - 2 PASS Construction to suit plant lay-out and installation costs.

INCINERATOR PACKAGE

For Sulphur Recovery Unit

In the production of Low Ash Metallurgical Coke (LAMC), large quantities of heat is carried away by flue gases and the hot coke itself. We have successfully operating WH Boilers, Custom Built to suit the plant layouts & location of gas tapping.

We have used: HORIZONTAL-MODULAR single pass, VERTICAL - HORIZONTAL, VERTICAL - 2 PASS Construction to suit plant lay-out and installation costs.

TAIL GAS TREATMENT UNIT PACKAGE

For Sulphur Recovery Unit

In the production of Low Ash Metallurgical Coke (LAMC), large quantities of heat is carried away by flue gases and the hot coke itself. We have successfully operating WH Boilers, Custom Built to suit the plant layouts & location of gas tapping.

We have used: HORIZONTAL-MODULAR single pass, VERTICAL - HORIZONTAL, VERTICAL - 2 PASS Construction to suit plant lay-out and installation costs.

Waste Heat Recovery Solutions for Coke Oven Batteries

TOP